Infrastructure Facility
Deringaj Bridge
Reconstruction of the Bridge over the Otuča River
Timeline
5 months
Project Description

The reconstruction of the bridge over the Otuča River was undertaken to enhance the safety and long-term reliability of the road. The existing dilapidated structure was replaced with a new composite steel-concrete structure, while retaining the bridge’s original dimensions. Special emphasis was placed on the rehabilitation and preservation of the existing stone abutments and piers. The project also included the arrangement of access areas and the adaptation of the bridge to modern technical requirements. The result is a functional and durable solution adapted to the conditions of the local road.
Total span length: 10.94 + 10.89 m
Bearing structure: steel (IPN 380) + RC slab
Designed lifespan: 50 years
Pier height: approx. 4.5 m